The Vendor Wrote Your Proof of Concept

A proof of concept the vendor scoped is a demo with a contract attached. The test that counts is the one the buyer writes first, runs on its own data, and scores against a holdout the vendor never sees.

October 2026 · By Adam Valine

In July 2024, Gartner predicted that at least thirty percent of generative-AI projects would be abandoned after proof of concept by the end of 2025. It gave four reasons: poor data quality, inadequate risk controls, escalating costs, and unclear business value. To a buyer, every item on that list is something a proof of concept exists to find out. If a project is abandoned for any of them after its proof of concept, the proof of concept did not test the thing that killed it.

That is rarely an accident or anyone's fault in particular. It is what happens when the party selling the system designs the test of whether to buy it.

None of this is an argument against buying. The MIT NANDA team's GenAI Divide report, the same one that produced the ninety-five-percent pilot-failure figure, reported that deployments bought from or built with specialized vendors succeeded roughly two-thirds of the time, and that internal builds succeeded about a third as often. Buying is often the right call. The narrower question is who writes the test when you buy.


A test of the vendor's best day

Follow a typical enterprise AI proof of concept from the first call to the steering-committee slide and you can watch six decisions bend toward the seller. None of them bends far, and each is reasonable on its own.

The vendor's sales engineer proposes the use case, because they know which use cases their product demos well. The data is a sample of a few hundred records, chosen because they are "representative," which in practice means clean, recent, and already in the format the product expects. Nobody picks the records with the missing fields, the free-text notes, or the codes left over from the last system migration, because nobody in the room is trying to make the demo fail. The success measure is that the demo works and the pilot users like it, and an earlier note made the point that neither of those is an evaluation.

The people and the terms bend the same way. The work is done by the vendor's best solutions engineers, who will move to the next prospect the week the contract is signed. The model is whatever the vendor's newest configuration is that month, tuned by those same engineers to that same sample. The engagement runs four to six weeks, free or heavily credited, and the cost question is deferred to the commercial conversation.

Put together, those six choices produce a test of the vendor's best day: best use case, best data, easiest measure, best engineers, best model, no bill. The buyer then signs a multi-year agreement to live with the vendor's average day.


After the contract is signed

Each of those six decisions now comes due. The proof of concept passes, and the steering committee approves the purchase on the strength of it. The rollout starts on operational data rather than the sample, and the accuracy the committee saw on the demo set does not show up. This is the data gap an earlier note described, arriving on schedule. The solutions engineers who built the demo have been replaced by a customer-success manager and a support queue, and the buyer's team learns how much of the demo depended on people who are no longer on the account. Six months in, the provider retires the model version the system was tuned on, and the behavior shifts in ways nobody can measure, because the only evaluation that ever existed was the demo. At renewal, usage-based pricing turns out to grow with the adoption the program was trying to encourage. And when someone finally asks what it would take to move to a competitor, the answer is that the prompts, the configuration, the tuning data, and the history all live in the vendor's format.

None of those surprises was hidden, and each could have been tested before signature. They weren't, because the proof of concept was designed by the one party with no reason to test them.


Five things the buyer writes, and who owns each

The fix is to run the proof of concept the way a buyer runs any other acceptance test: criteria written in advance, on the buyer's terms, with the commercial and exit questions answered while the buyer still has something the vendor wants. That comes down to five artifacts, each owned by someone on the buyer's side. The vendor can contribute to all five but should own none.

Pass/fail criteria, written before the vendor sees anything. Owner: the executive whose workflow the system will change. One page that names the workflow, the baseline it runs at today, the threshold the system has to clear, and the specific failures that disqualify it regardless of the average. A contract-review tool that scores well overall but sometimes misses a termination clause should fail, and the page should say so before anyone sees a score. This is the value memo from an earlier note, turned into an acceptance test. If the buying team cannot write it, the proof of concept is not ready to start.

Your data, ugly part included, with a holdout the vendor never sees. Owner: the person who will own the evaluation in production. The proof of concept runs on a sample of real operational data that deliberately includes the malformed records, the edge cases, and the inputs the current process handles badly. A portion of that set is held back and run only at the end, by the buyer's own people. Anything the vendor sees for six weeks, it can tune for, and a good engineer will do so without meaning to. The holdout is the golden-dataset discipline of an eval practice applied to procurement, and it is the cheapest protection a buyer has against a system tuned to pass its own test.

Your engineers on the keyboard for part of it. Owner: the lead of the team that will run the system in production. At least one person from that team should configure the system, break it, and fix it during the proof of concept, without the vendor's engineers in the room. Their experience, not the vendor's best engineer's, is what the next three years will feel like. If your engineer cannot change a prompt, add a data source, or read a failure log without opening a ticket, that is the support model you are buying.

Cost at production volume, not demo volume. Owner: finance, not the project sponsor. The proof of concept should end with a written cost model at the usage level the business case assumes, and at several times that level, including retries, long inputs, and any agent behavior where one user request becomes many model calls. A free proof of concept says nothing about price. The cost model should show the number the CFO will see in year two. The sponsor wants the project to happen, so someone without that stake should check the arithmetic.

Exit terms, negotiated now. Owner: general counsel, with procurement. This is the one most buyers leave for the renewal, and the renewal is the worst moment to raise it. Before signature, the buyer should have written answers to four questions. May the vendor or its model providers use your inputs and outputs for training? In what format can your prompts, configurations, evaluation sets, and logs be exported? How are model versions pinned, and how much notice do you get before one is retired? What does the contract allow the vendor to change in pricing mid-term?

On the model question alone, the foundation providers' own published policies set the floor. Anthropic, for example, commits to at least sixty days' notice before retiring a publicly released model, and the cloud platforms that resell those models run their own separate schedules. Your vendor sits on top of all of that. Ask how it passes that notice through to you, and what it tests before it moves you to a new version.

Set against the sequence above, the five cover every step. The criteria and the holdout catch the accuracy that did not show up. The buyer's engineers learn in advance what the handoff to a support queue will mean. The version terms, backed by an evaluation set the buyer owns, cover the model retirement, the cost model covers the renewal, and the export terms cover the exit.


Agents make the demo tell you less

In June 2025, Gartner predicted that more than forty percent of agentic-AI projects would be canceled by the end of 2027, for escalating costs, unclear business value, and inadequate risk controls. That is three of the four reasons it gave a year earlier. In the same research it estimated that only about a hundred and thirty of the thousands of vendors marketing "agentic" products had real agentic capabilities, and it gave the rebranding of existing assistants and chatbots as agents a name: "agent washing."

A buyer cannot tell the difference from a demo, because a scripted demo of a chatbot and a scripted demo of an agent look the same. The difference shows up where the script ends: an input the system has not seen, a tool that returns an error, a task that needs a step nobody planned for. A buyer-run proof of concept puts those cases in front of the system on purpose. The most useful request a buyer can make in an agent proof of concept is to watch it fail on the buyer's data, without a reset, and see what it does next: whether it notices the error, tries another route, or stops and says it is stuck, or whether it carries on as though the step succeeded.

The cost model matters here too. An agent that retries its way out of trouble does so on the buyer's bill, and a demo that never goes off script never shows how many calls that takes.


The vendor's reaction is part of the diligence

Raise these terms with a serious vendor and the conversation usually gets easier. Vendors whose product works on real data generally want to be tested on real data, because that is how they win against competitors whose products cannot pass the same test. Vendors with mature operations already have export formats, version-pinning policies, and data-use terms written down, because their other enterprise customers asked first.

The vendors who resist are telling you something the demo could not. A vendor that insists on keeping the test on its own sample expects your data to hurt the result. If it cannot say how a model retirement is handled, it has no evaluation to run when one happens. And if it treats the exit question as hostile, you have learned where its retention comes from. An earlier note argued that enterprise buyers have started using a vendor's governance maturity as a proxy for its operational maturity, because the two travel together. The proof of concept is where to apply that test, because it is the one point where the buyer can watch the vendor's operations instead of reading about them.


What the buyer gives up at signature

Before signature, the buyer controls the test, the data, the timeline, and the decision. After it, the test becomes the vendor's roadmap, the data lives in the vendor's format, the timeline becomes the contract term, and the decision becomes the renewal, made with switching costs that did not exist the first time. The proof of concept is the last point in the relationship where the buyer can require evidence instead of accepting assurances, and the price of requiring it is a few extra weeks and a page of written criteria.

The vendor will run a good proof of concept, because that is its job. The buyer's job is to decide what the proof of concept has to prove.

Adam Valine leads Veil Consulting's Vendor & Tooling Diligence practice. Currently AI Strategy Lead at Solutions Plus Consulting; twenty years of prior product and engineering leadership across SaaS and platform companies.


Sources

  1. Gartner, Gartner Predicts 30% of Generative AI Projects Will Be Abandoned After Proof of Concept By End of 2025, press release, July 29, 2024.
  2. MIT NANDA Initiative, The GenAI Divide: State of AI in Business 2025; coverage: Fortune, August 18, 2025.
  3. Adam Valine, Your AI Pilot Is Working. Your AI Program Isn't., Veil Consulting Notes, July 2026.
  4. Adam Valine, The Evals Are the Product, Veil Consulting Notes, March 2026.
  5. Anthropic, Model deprecations, documentation.
  6. Gartner, agentic-AI cancellation forecast, June 25, 2025; coverage: Reuters via The Star, June 25, 2025.
  7. Adam Valine, AI Governance Is a Speed Feature, Veil Consulting Notes, May 2026.